Next numerical gate for retrospective forecasts
The twenty-group saved stopping audit
found 49 fits that passed their initial stationarity check but failed the
frozen fresh cost-change limit of 1e-8. Five of those also failed fresh
stationarity. None failed the specified training-position change limits or
used its full evaluation allowance. The median failed cost change was
4.48e-8; the largest was 2.47e-5. All 50 original nonpassing labels stay
unchanged.
The next solver qualification must answer whether a numerically different solution would make a materially different withheld-position forecast. Similar training costs or positions alone cannot answer that, because weak calibration directions may grow during an uncorrected forecast.
- Use independently generated known-answer IMU and receiver histories, with all three physical candidates, both clock interpretations, interior and boundary calibrations, and deliberately weak directions. Keep the true trajectory separate from the estimator.
- Compare at least two bounded numerical methods on identical inputs and the same permitted physical parameter box. Score objective agreement, fresh stationarity, training-position stability and later forecast-path agreement before looking at generated truth.
- Choose any revised stopping rule and a useful forecast-stability tolerance from the generated development controls. Freeze its source, thresholds, environment and finite charges before independent generated confirmation. Count every failed fit against the confirmation gate.
- Only after that, run a separately frozen, reboot-resumable observed development comparison. Select its recording groups without using the new forecast outcomes. Preserve every original fit and the 80-task study unchanged. Reserved ESA confirmation groups remain closed.
The first saved-path diagnostic reconstructed all 49 bounded corrections from retained residuals and Jacobians, verifying their predicted changes against the recorded probes. The corrected parameter vectors were not retained in the original study; they are now separate diagnostic artifacts. A separately charged three-case forecast check found path changes up to 16.3 mm in its preselected numerical range without reading later receiver positions. It cannot retroactively pass a failed fit, establish forecast accuracy, or replace the independent generated controls above.
The first generated forecast control has now passed 24/24 fits and all six four-fit comparisons across three physical models and two clock constructions. It uses independently generated 12-second paths and six free calibration parameters. The next qualification must expose all 26 archive calibration directions, weakly constrained and noisy histories, and a longer withheld period before a changed stopping rule can be frozen. The observed 50 nonpassing labels remain unchanged. The four-fit pilot closed all four full-calibration noisy generated fits and found later-path agreement between the two bounded solvers and two starts. The multimodel control then passed all 24 generated fits and all six four-fit gates across three models and two calibration settings. Those six cases share a declared noise seed. The nominal 200 Hz control then passed 24/24 fits and 6/6 agreement gates under six distinct noise seeds. Its exact sample grid does not test irregular header timestamps. The longer generated confirmation then passed all 24 fits and six preregistered solver/start forecast-agreement gates on 120-second histories. The saved two-start aircraft audit found all 40 original forecast pairs within 0.1 m, with a maximum difference of 6.03 mm. A separately frozen observed development method may now test forecast stability as its own numerical property. It must retain the 50 original nonpassing fit labels and cannot call a stable forecast an optimized fit, a calibrated prediction or a scientific detection. The solver-independence correction narrows the generated qualification: the two named providers share the same trust-region optimizer. A genuinely different bounded method must pass before using optimizer agreement as evidence of numerical stability on aircraft data. The short independent-method control has now passed all 24 fits and six generated agreement gates using SciPy TRF versus the trust-region optimizer. This repairs the method-diversity gap for those short generated inputs. The 120-second independent-method control also passed all 24 fits and six generated agreement gates after a finite, hash-verified recovery of four tasks interrupted by a host reset. These controls led to a separate observed real-worker preflight and a finite development comparison on three preselected recordings. Neither generated control establishes aircraft prediction accuracy. The recorded-input preflight passed its worker wiring check but did not converge under its 30-call smoke-test cap. The versioned 24-fit observed comparison has now closed within its finite limits. All fits completed technically, but only 7/24 met numerical stopping checks and 4/6 matched sets met the development path-agreement scale. The saved-result diagnosis has classified all 17 nonstopping fits and both disagreeing cuts. Ten fits fail only the relative cost-change check; the two disagreeing cuts also have the largest fitted time-offset spreads. That motivated a fixed-endpoint timing and cost-repeatability check on those cuts and matched stable controls. The fixed-endpoint check has now closed: 8/8 exact same-point replays, 80/80 calls charged, and timing derivatives close to finite differences even where packet intervals change. The 2010 maximum path pair differs by only 0.004 ms in fitted time offset; the 2015 pair differs by 11.237 ms. Next: analyze joint calibration valleys and later-path sensitivity on these saved development solutions before proposing another optimizer. Preserve original bounds, measurements and failed labels. No aircraft fit has been reclassified or promoted to a scientific detection. The fixed calibration-swap check then completed all 24 declared vectors without refitting. Whole-vector swaps reproduce the original forecasts exactly, while isolated calibration-group swaps substantially worsen the training cost and can move later forecasts by hundreds of metres. This shows strong coupling between fitted groups; those isolated hybrids are not acceptable alternative fits. The next fixed check should trace the cost and forecast along the complete parameter-vector connection between each pair, before a revised numerical method is proposed. That six-point complete-vector check has now closed without refitting. The 2010 pair has a modest midpoint cost rise; the 2015 pair stays near the endpoint costs. Both pairs retain later-path differences. A straight line cannot exclude a curved low-cost connection. The next method qualification must test whether independent bounded optimizers and starts recover stable forecasts under the same recorded calibration box and genuinely independent generated truth; the original aircraft stopping failures remain failures.
The continuation runbook gives the frozen status and resume commands for the long control and its gated observed pilot.