Local Level Lab

Airborne measurements. Open methods.

Do small stopping corrections change later forecasts?

In these three selected cases, very little. The test compared each saved forecast with one new forecast from its saved bounded correction. It did not use receiver positions from the later interval to form either new forecast or choose a correction.

Saved numerical case Later north RMS change East RMS change Up RMS change Largest horizontal change
Smallest failed cost change 0.014 mm 0.011 mm 0.0007 mm 0.038 mm
Middle failed cost change 0.018 mm 0.011 mm 0.0057 mm 0.052 mm
Largest failed cost change 3.93 mm 7.51 mm 0.414 mm 16.3 mm

The separately frozen v2 repair plan fixed a missing native C source in the first attempted study. That first study sealed three technical failures before any native call; none were reclassified or rerun within it. The repaired study ilvis0-correction-forecast-development-v2-20261118 completed 3/3 tasks, charged exactly three native calls and 110,495,945 packet visits, and has manifest SHA-256 89216b4e43197491e93a3e5af0456f52b74b8a8abfc6f56811802ea8ae266837. All nine source-bound software checks passed.

These are differences between predicted paths, not errors against the actual later receiver track. The cases were chosen by the smallest, middle and largest failed numerical cost change among 49 saved probes. They are useful for diagnosing the stopping check, but cannot estimate a population failure rate, establish forecast accuracy or make an Earth-model decision. The original 50 nonpassing fit labels remain unchanged. Independent known-answer controls and a separately frozen observed method are still needed before revising that stopping rule.