Local Level Lab

Airborne measurements. Open methods.

Longer independent-optimizer forecast control

6/6 generated histories passed the preregistered numerical agreement gate. 24/24 fits passed their unchanged final stopping checks; 24/24 passed the separate generated physical screen; 0 had technical failures.

Generated model Clock Numerical stops Physical screen Largest later-path spread Training cost range
sphere_rotating header_elapsed 4/4 4/4 4.97e-06 m 2.92e-10
sphere_rotating nominal_200Hz 4/4 4/4 2.74e-07 m 2.42e-10
sphere_still header_elapsed 4/4 4/4 1.1e-05 m 5.03e-10
sphere_still nominal_200Hz 4/4 4/4 2.43e-05 m 3.09e-10
flat_still header_elapsed 4/4 4/4 3.67e-05 m 3.31e-10
flat_still nominal_200Hz 4/4 4/4 9.06e-06 m 3.52e-10

Largest later RMS error against generated truth: 4.12 m horizontal and 2.37 m in height.

SciPy TRF and the custom trust-region solver are separate bounded optimizers. Each fit uses 79 earlier receiver reports to predict 40 withheld reports over a 120-second generated history. The six histories have distinct noise seeds but one generator family. This numerical control cannot establish a global optimum, aircraft prediction coverage or a scientific decision. The original 50 nonpassing aircraft fit labels remain unchanged. A host interruption left two charged starts unfinished; the original allowance is sealed and the four missing identities were completed under a separately qualified finite recovery. No completed task was repeated.

Frozen plan · All fit outcomes · Earlier scope correction