Fixed calibration-swap result
All 24 declared vectors finished. Each unchanged baseline and full-vector swap exactly reproduced the corresponding saved training cost and continuous forecast. No optimizer ran and no later receiver position entered a calculation. The table shows how far each one-group swap moves the later forecast path from its anchor; the two numbers are the two swap directions. Training cost is the weighted squared receiver error on the fitted portion, not metres.
2010 northern pair
The two original forecasts differ by up to 0.752 m.
| Swapped coordinates | A toward B path shift | B toward A path shift | Training cost increase |
|---|---|---|---|
| time | 0.001 m | 0.001 m | 4.07e-07–4.09e-07 |
| vertical | 9.594 m | 9.967 m | 3.13–3.38 |
| horizontal | 99.156 m | 99.134 m | 341–341 |
| state mount | 92.797 m | 93.325 m | 294–298 |
The isolated swaps worsen the training fit. Their path shifts are not plausible alternative forecasts on their own. The nearly equal costs of the two whole vectors instead show that calibration groups compensate one another. Their effects need not add up to the full pair difference.
2015 southern pair
The two original forecasts differ by up to 0.320 m.
| Swapped coordinates | A toward B path shift | B toward A path shift | Training cost increase |
|---|---|---|---|
| time | 2.362 m | 2.362 m | 3.56–3.56 |
| vertical | 7.193 m | 7.193 m | 0.165–0.165 |
| horizontal | 302.025 m | 302.046 m | 2.62e+03–2.62e+03 |
| state mount | 299.773 m | 299.788 m | 2.57e+03–2.57e+03 |
The isolated swaps worsen the training fit. Their path shifts are not plausible alternative forecasts on their own. The nearly equal costs of the two whole vectors instead show that calibration groups compensate one another. Their effects need not add up to the full pair difference.
Training costs and each vector’s remaining distance to the opposite forecast are retained in the complete table. A forecast shift does not identify the true physical calibration or make a failed fit pass. The numerical method, aircraft prediction adequacy and Earth-model decision remain unqualified.