Fresh generated start-equivalence check passed
The faster model-declared tangent passed all six generated settings on a new 180-second route calculation. Both fixed starts were run for each of the three physical models and two upstream-removal settings. All 12 paired tasks passed their own numerical and physical checks. The revised rule also passed same-start cost agreement, near-minimum start selection and forecast agreement both across and within methods in every setting.
| Measure | Result | Frozen limit |
|---|---|---|
| Complete settings passing | 6/6 | 6/6 |
| Largest cross-method forecast separation | 3.13 × 10⁻⁹ m | 0.01 m |
| Largest within-method forecast spread | 3.13 × 10⁻⁹ m | 0.01 m |
| Settings with different primary starts | 2/6 | Allowed only for near ties with stable forecasts |
The cost rule used the pre-existing near-zero solver ceiling of 1e-8
sum-of-squares units as its absolute floor, alongside the frozen 1e-8
relative tolerance. The method note explains
why that floor belongs to this generated near-zero objective. The original
120-second study remains failed under its own 2/6 rule; this new result
does not rewrite it.
The machine report verifies every sealed artifact and records all six rule outcomes. The frozen plan fixes the geometry, criteria and limits. The study completed in 1,381 seconds, charging 240 of 4,824 allowed native calls and 1.146 of 20.541 billion allowed packet/query visits. Its 52 source-bound software and recovery checks passed.
This is generated-data method qualification only. It contains no NASA or ESA aircraft recording, and it does not establish which Earth model is true. The faster tangent cannot replace the established wide calculation on observed data until a separately frozen development comparison passes under an objective-scale rule justified for that observed fit. The seven reserved ESA flight groups remain closed.