Fresh 180-second start-equivalence qualification
Question and boundary
Test whether the model-declared tangent and established wide tangent return the same useful forecast under the revised near-zero start rule on a new generated training geometry. The completed 120-second study remains failed under its frozen rule. No recorded NASA/ESA measurement or reserved flight group enters this study, and passing cannot authorize observed-aircraft substitution by itself.
Frozen case and rule
- Use the existing generated
fastroute at 55° latitude for 180 seconds and 179 receiver queries; the old study used 120 seconds and 119 queries. The new training split and later path include generated times absent from the original study. Keep its three models, both upstream-removal settings, two fixed starts, calibration bounds, noise policy, 300 Hz IMU rate and common input binding. There are 12 paired tasks and 24 fits. - Use the wide tangent as reference. Use model-declared selective tangent
for globe and wide tangent for disc. Keep the 0.01 m maximum forecast
separation. Compare costs with the existing
1e-8relative tolerance and an absolute floor of1e-8sum-of-squares units, exactly the pre-existing near-zero solver acceptance ceiling. Require every fit to pass its own numerical and physical checks, same-start costs to agree, any changed primary start to be near-minimal under both methods, and all near-minimum forecasts to agree both across and within methods. Later receiver truth never selects a start. - A setting passes only if both starts and all these rules pass. The generated method gate passes only if all six settings pass. A failed setting blocks dependent observed substitution; preserve it without changing this rule.
Finite execution and recovery
Each task has at most 402 native calls and 1,711,750,000 packet/query visits, totaling 4,824 calls and 20,541,000,000 visits across 12 tasks. Declare four workers at one numerical thread each and a two-hour cooperative wall allowance. Use a fresh study identity, source/environment qualification, exact parent receipts, charged starts, append-only journals, atomic outputs and task-level resume. Prove interruption recovery before launch. Completed failures are never retried. Keep historical source bytes unchanged; the new adapter calls shared calculation components.
If the generated gate passes, separately freeze an observed development comparison with its own objective-scale rule and finite allowance. The absolute cost floor above belongs to the generated near-zero stopping policy; do not transfer it to aircraft fits without justification.