Local Level Lab

Airborne measurements. Open methods.

Cost and start checks for a future faster tangent method

The completed two-start study remains failed under its frozen rule. A separate versioned comparator now handles training costs near zero and requires forecast stability within each method's near-minimum starts as well as across methods. It preserves the original checks that every fit pass, the input and forecast grid match, same-start costs agree, and a changed primary start be near-minimal under both methods.

Its cost rule is

|cost A − cost B| ≤ absolute floor + relative tolerance × max(cost A, cost B).

The proposed absolute floor for this near-zero generated protocol is the already declared near-zero stopping ceiling, 1e-8 sum-of-squares units from ilvis0_near_zero.POLICY. The relative tolerance remains 1e-8, and the forecast separation limit remains 0.01 m. This floor was part of the solver's existing policy before the first two-start result; it was not chosen from that result's cost gaps. The comparator rejects an invalid floor and a case where two same-method starts differ by more than the forecast limit even though each is close to the other method.

Applying this revised rule to already sealed fits is retrospective diagnosis only. It cannot turn the failed study into a qualification. A new prospectively frozen generated scenario and then a separately selected development recording must pass before the faster method can replace the established wide calculation. The absolute floor applies only where that same near-zero stopping policy governs the objective; it is not transferred to an observed-aircraft cost automatically.

The saved-result diagnostic verified the sealed study and passes all six groups under this revised rule. The original frozen result remains 2/6, and the retrospective 6/6 result does not authorize method substitution.

The original adapter fixed a 120-second route. A separate prospectively frozen 180-second study now passes all six settings under the revised rule. It uses newly generated training and forecast times, preserves the old failed study, and still does not authorize observed-aircraft substitution. That requires a separate development comparison with a justified observed-objective tolerance.