Diagnostic requirements

The main comparison is numerically complete: 53 globe preferences, zero flat preferences and zero unresolved stretches. Further diagnostics strengthen interpretation; they are not a remaining main-analysis recovery queue.

An IMU (inertial measurement unit) supplies recorded gyro and acceleration increments. Primary-receiver observations constrain the reconstructed motion. Group-1 fused navigation remains decoder-check and motion-context material.

Authoritative backlog · Public next steps · Current findings.

Foundation: provenance and confirmation boundary — F01/F02

Group source aliases, UTC overlaps, shared legs and supported flight/installation relationships before choosing validation splits. Distinguish recorded configuration from proven physical instrument identity. Use conservative groups; do not equate 53 stretches with 53 independent flights.

The metadata ledger now records 27 conservative groups for the 53 stretches, with eleven deterministic grouping checks. These groups do not establish independent instruments or installations.

ESA recording 187 is development material. All other currently cataloged ESA flight groups are protected from model fitting and outcome inspection until the method and confirmation identities are frozen. Integrity and receiver-only eligibility checks are allowed. Group shared files and overlaps together.

Measurement contribution — C01–C04

Completed controls include independent Cartesian force truth, receiver derivatives with joint covariance, approximation and averaging stresses, constant-gain ambiguity, and the seven-column local calibration matrix. Preserve all failed approximation screens and uninformative controls.

Remaining gates are bounded nonlinear calibration, quantization, integration intervals/time association, averaging, common motion-based support and propagated uncertainty. Require known-answer, boundary and independent-start checks before a finite recorded-data comparison. Use the same physical region for all candidates.

The first nonlinear study passed only 32/72 complete matrix comparisons. The separate certificate candidate now qualifies all 72, distinguishing feasible scalar matches from optimizer convergence. Both studies are complete and cannot resume. Observational timing and uncertainty still block channel fitting. The first 17 quantization/period checks pass, without establishing a continuous-force bound or statistical coverage. The further eleven direction-cone controls bound continuous averaging only under an explicit force-direction-rate assumption. Another 34 common-support controls check whole-packet association and bound scalar averaging/common-offset effects. No such motion envelope, physical clock or statistical coverage is established for the actual recordings by these software checks. The 13 derivative-error controls now bound truncation under a declared higher-derivative envelope. Supported physical envelopes remain open. Thirty further nonlinear force-box controls pass. The combined chain now includes fifteen calibrated-increment and six independent end-to-end checks. The finite observational snapshot assessment is now complete: all 144 candidate cases overlap, none unsupported. The whole-history continuation also completes: 763 groups, 27,468 overlapping cases and one common zero-calibration point surviving all 24 history variants. Receiver/latency/gravity dependence remains relaxed, so no full gyro-free trajectory or calibrated likelihood follows. Next qualify the training-only fitting and prediction pipeline under the revised protocol. Global uncertainty certification is a separate research track.

The structured covariance operations are qualified against dense references and a 64,080-epoch/27-column benchmark. They preserve block state and avoid whole-record dense factors. This does not qualify covariance estimation, bounded nonlinear uncertainty or native integration.

Acceleration magnitude is a gyro-free necessary constraint. Agreement neither determines orientation nor proves a complete gyro-free fit. Never insert fused attitude, equate aircraft heading with GPS course, or retain an omitted sensor through initialization. Do not tighten bounds or select favorable residuals to create discrimination.

Channel requirements · Calibration evidence.

Withheld prediction and adequacy — V01/V02

The revised protocol now governs this sequence. Known-answer software controls precede a metadata-selected retrospective pilot. Formal global bounds no longer block exploratory prediction comparisons; uncalibrated sensitivity remains distinct from confidence or detection.

Develop a shared correlated-error model on training observations only. Preserve cross-axis dependence, full-record drift anchors and uncertainty from calibration and covariance estimation. Local unconstrained covariance alone does not qualify bounded nonlinear prediction intervals.

Freeze group membership, training/prediction blocks, initialization dependencies, physical adequacy criteria and finite numerical limits before evaluation. Keep prediction observations out of fitting and covariance selection. Within-record prediction and cross-flight calibration transfer are distinct tests; transfer requires supported installation continuity.

Report physical errors in every axis, temporal correlation and residual trends against motion, speed and latitude. A better horizontal fit with kilometres of height error fails to describe the full flight. A lower relative cost alone does not establish adequacy.

The NASA corpus has already informed development. New blocked tests are retrospective validation, not untouched confirmation. Earlier incomplete split-recording trials retain their labels.

Independent replication and scalability — L01/E01/E02

The first ESA selection inventory is complete and admits no stretches from development recording 187. Preserve that outcome. The receiver-motion calculation now passes its diagnostic, but receiver error and motion-model adequacy remain unresolved before a revised policy. Rate arithmetic is checked under an explicit sampling hypothesis, while sampling phase, clocks, axes, lever arms and dataset-specific calibration still require qualification. Reuse no Applanix bound or threshold automatically.

Structured covariance, marginal-coordinate whitening and matrix-free residual/Jacobian operations now pass dense references and long-record controls. The bounded prediction calculation also passes its generated-data coverage study; native global remainder and observational error assumptions remain open. Check streaming integration and receiver association across block boundaries. Computational blocks must not silently drop statistical dependence.

Freeze the development method and adequacy/error rules before reserved ESA confirmation. No eligible interval, no estimable contrast or a failed fit remains an explicit outcome; no outcome-driven policy relaxation follows.

Gyro prediction and publication — G01/U01/U02

Keep the raw plot unchanged. Its companion compares signed variation with course/latitude/mount/transport/field predictions. Identify fitted-orientation dependencies and retain unknown aircraft motion or mounting. Fused attitude and common accumulated sign cannot establish independent curvature evidence.

Assemble one versioned paper dataset with groups, observations, assumptions, fits, withheld errors, exclusions and hashes. Calibrate the complete shape-first hierarchy, including selection of the better globe model, the later field comparison, correlated errors and nuisance fitting. Numerical preference, physical adequacy, prediction and calibrated detection stay separate.

Deferred and supporting work

Further main NASA recovery is retired. Broad horizontal timing searches, large Z-axis grids and synthetic passenger-route optimization are deferred. Retain completed clock/calibration evidence; the packet timestamp need not equal an increment's physical integration period.

Free background-field estimation follows contribution and prediction gates; solar/sidereal precision follows a freely estimated field and supported clock, gain and offset precision. Wuhan and stationary-consumer expansion remain separate lower-priority branches. Exact instrument documentation supports assumptions but does not suspend qualified modeling.

Historical diagnostics preserve earlier plans and results.