Analysis roadmap
Where the project stands
53 of 53 selected stretches favored a globe over the tested flat disc. The flat disc was preferred in 0 stretches. 0 lacked a consistent preference. The verified results give the model and repeat counts.
NASA's selected-stretch comparison is numerically complete. The later NASA forecasts and the ESA forecasts use development recordings. Seven separate ESA groups each have one timing-verified 20-minute slice. They have supplied zero confirmation fits. Prediction evidence · ESA timing
RF04 now provides a separate motion record covering all 443 one-second reports in the selected NASA stretch. ESA confirmation awaits independently supported aircraft-error limits, including evidence on platform orientation and the shared roof antenna. RF04 intake · ESA instrument provenance
The Nuuk Museum receiver covered all 120 intervals in the development comparison. With the full satellite set and the other example limits fixed, the covered aircraft range error would need to stay below about 2.10 mm RMS. The aircraft antenna, tracking, absolute position and inertial errors still need independent constraints. Required error bounds
An adversarial review of the saved NASA fits found no error in the equations or the file decoding. Across every saved attempt the disc's cost stays at least 70 times the globe's. The review's four checks on the existing archive are listed as A01 to A04 below.
Current milestones and finish line
- Constrain the errors that can change a comparison. Assess GPS errors shared by the aircraft's receivers and uncertainty in inertial measurements and fitted calibration. The current error budget states the limits that measurements would need to support.
- Qualify and freeze the full prediction rule. Specify the training interval, withheld positions, matched model and processing cases, accuracy checks, and treatment of failures. Use independent known-answer cases and aircraft-relevant errors to test the rule. Any allowed evidence that shares observations stays in the same flight group.
- Test the reserved ESA flight groups. Freeze their selection, error model and comparison rules first. Report model preference, absolute prediction accuracy and calibrated uncertainty separately. Keep missing or inadequate groups in the count. Seven reserved groups provide a transfer test with limited coverage resolution.
- Verify the evidence. Preserve originals, charged work, incomplete results and source hashes. Link each public claim to the verified report that supports it. Publish enough evidence to reproduce the result and state what remains unresolved.
What would advance the next test
| Needed evidence | What the development checks tell us |
|---|---|
| An independent check on the GPS error shared by the aircraft receivers | The receivers share one roof antenna. The two ground stations constrain some shared satellite errors, but their agreement gives no upper bound on errors local to the aircraft. A useful check would measure or bound the aircraft antenna and tracking errors over the scored interval. Two-station comparison |
| Time-matched horizontal motion and instrument orientation | The two-minute comparison covered a 401 m climb. A north–south path change can span the saved score gap while changing the horizontal force by just 0.37–0.71 mm/s² RMS. Both the quartz disagreement and the effect of a 0.1-second clock shift are larger. A timestamped platform-state and orientation record would help assess what the separate sensor can resolve. Horizontal force comparison · Flight and instrument context |
| A justified joint bound on calibration and forecast errors | For the saved zero-field forecast pair, the compact calculation pins the best uniform error allowance at about 2.25 cm per coordinate under the existing assumptions. The targeted earlier GPS checks leave that limit unchanged. Independent calibration limits or evidence about how errors vary together across the forecast would change the calculation. Compact bound · Follow-up |
The numbers above refer to specific development comparisons. The training profiles show differences in satellite geometry and motion on the reserved flights. Any error model used for confirmation must cover those conditions.
The alternate archive screen found an open low-speed drone sample suitable for an ingestion check. The strongest crewed-flight lead uses two antennas and two inertial units. Public raw file access and usable flight geometry remain unverified for it.
Dependency-ordered backlog
| ID | Priority | Status | Work or evidence |
|---|---|---|---|
| F01 | Foundation | Complete | Record provenance and dependence for the NASA and ESA groups. |
| F02 | Foundation | Complete | Reserve seven separate ESA groups for confirmation. Use recording 187 for development. All eight groups share one identified instrument. |
| A01 | First | Complete | The published selection, repeated across all 232 files without the navigation-status requirement, reproduced all 53 stretches and found 16 more intervals totaling 114.9 minutes. All 16 come from a second recorder on the 2011 and 2015 flights. Fourteen overlap a published stretch on the same flight and two add 14.2 minutes of flight time. Profiled with GPS alone, 14 of the 16 fall inside the range of the published stretches and two are just outside on one measure. None is fitted. Next gate: a parameter-information check and a fixed fitting plan before any of them enters a fit. Result · GPS-only motion · Review S2 |
| A02 | First | Complete | The longest stretch on each of the 27 flight dates was refitted with gyro-offset allowances of 3, 10 and 30°/hour, for the globe with the field and for the disc with and without it: 243 fits. At 3°/hour the globe's cost was lower on all 27, by at least 26 times. At 10 and 30°/hour the disc with the field came within 6% to 27% of the globe's cost on three stretches at 72 to 75°N, and 1% below it on one. On all 23 southern stretches the globe stayed at least 9 times lower. The disc's fitted forward and right offsets followed what the globe's turning predicts (correlation 0.92 to 0.96), while the globe's own stayed under 1°/hour. Many fits reached the 200-evaluation limit. Across the 27 stretches the globe's fitted pitch offset showed no trend against speed, and the disc's offsets were too scattered to show one. A scan of all 232 files for steady flight at 180 to 700 km/hour found two intervals of under five minutes at about 550 km/hour. Both were then given the same nine fits under a plan fixed in advance. The globe's fitted pitch offset stayed within 0.05°/hour of zero, and the disc with the field asked for −4.93°/hour on both, matching the lower speed. The closer disc came within 4% of the globe's cost at 10°/hour and above, and on one interval within 3% at 3°/hour. Ten of those 18 fits reached the evaluation limit. Next gate: none on this archive, which holds no other steady flight below 700 km/hour. Result · Slower-flight scan · Fits at 550 km/hour · Fixed plan · Review S1 |
| A03 | First | Complete for 52 stretches | The disc with the specified field was fitted on the 53 stretches under both processing assumptions, at the published 1°/hour gyro-offset limit. The globe's cost was lower on all 52 stretches with a result, by at least 42 times. Both disc fits met the stopping check on 18 stretches, where the smallest ratio was 318. One stretch has no result after an interrupted run and a failed recovery attempt. Result · Fixed plan · Review S3 |
| A04 | Supporting | Complete for 32 stretches | The aircraft's own one-second records for 2011 and 2015 cover 32 of the 53 stretches. On all 32 the separate GPS track agrees with the instrument's to about a metre across the direction of flight, and the two systems report the same amount of turning. Along the track the positions differ by a nearly constant 0.39 s in 2011 and 0.44 s in 2015. With the gyro windows moved by that time difference, the one-second turning agrees to a median of 0.014°. No record exists for the nine stretches of 25 to 29 October 2015. Result · Turning at the time difference · Records |
| C01 | First | Complete | Verify the basic motion and channel calculations. |
| C02 | First | Aircraft error bounds open | A constructed north–south position error spans the GPS score gap but raises Galileo range disagreement by about half. The broader joint bound still leaves two screened cases open under the example limits. Independent motion and platform orientation remain open. |
| C03 | First | Two matched development settings complete | Matched forecasting favored globe in both complete settings. Two settings remain unresolved. Test matched forecasts under a qualified aircraft error model. |
| C04 | First | RF04 sampled-motion checks complete | With RF04 attitude supplied, both force averages favor globe. Plausible rounding covers the east disagreement. Rounding plus sampled antenna motion leaves part of the north disagreement. Independent receiver and faster motion limits remain open. |
| V01 | First | Software controls passed | Known-answer forecasts passed. Development replays verified earlier-only receiver inputs and selection before scoring. |
| V02 | First | Retrospective accuracy checked | The matched NASA forecasts reached their accuracy limit with 1.69–8.22 m of added shared GPS error, while their first model-ranking ties needed 39.01–62.74 m. Nine of the 20 transfer groups supplied a passing later-cut fit. Independent forecast accuracy remains open. |
| L01 | During qualification | Faster globe solver checked on one recording | Paired solver results match on the development window. Two linear solvers both pass seven exact controls. A nonlinear step correction passed the same four of eight cases as the existing solver. The wide method remains the reference for other observed recordings and the disc. |
| L02 | During qualification | Linear-memory scoring checked | The structured receiver operator agrees with dense controls. Aircraft uncertainty remains open. |
| E01 | Before confirmation | Reserved layouts and plan checks ready | All seven fixed slices support both training lengths with the same withheld reports. The preflight binds those layouts and checks the bytes of the method, error model, adequacy and decision rules when they are ready to freeze. |
| E02 | First | Aircraft error bounds open | The range threshold is about 2.10 mm RMS under the other example caps. A static antenna response would need a slope of at least 5.94 mm/° to explain the full score gap by itself. The two-station check finds 6.54 mm RMS ground disagreement. Actual station and aircraft error limits remain open. |
| G01 | Development | Matched-field gyro diagnostic complete | The group-weighted pitch comparison favors globe across the tested poses at the specified field for both shapes. The zero-field ranking can change. Independent aircraft motion and mounting effects remain open. |
| U01 | Before publication | Development evidence verified | The evidence tables track reused observations and numerical failures. The carrier verifier checks the ground and airborne satellite evidence. The motion verifier checks the clock, tilt and paired-sensor studies. One RF04 command now ties seven reports to their frozen inputs, outputs and 183 recorded operations. |
| U02 | Before a calibrated claim | Aircraft calibration open | The simulation reference replay recovered 286 scores per scenario and kept 13 unavailable seeds. The reference work check detects fixed ranks, including when a candidate ties or wins a setting. The two-stage rule still needs an aircraft error model and independent testing. |
| U03 | Development | Simulated validation passed | The recorded continuation finished the 181-case generated study under its original rules. |
| R01 | Later | Planned | Estimate the background angular field freely. The review proposes adding a freely fitted curvature, so the result is a measured radius and rotation rate with their spread across flight dates. |
| R02 | Later | After R01 | Test whether field measurement is precise enough to distinguish solar from sidereal rate. |
| S01 | Later | Separate work | Continue the stationary experiment and secondary data leads under their own rules. |
| D01 | Supporting | Open | Document exact instrument corrections where sources allow. Keep the tested processing assumptions visible. Instrument guide |
Execution order and completion checks
Use a separate recorded allowance for each new study. Bind selection, inputs, source, environment, methods, recovery limits and observable exit conditions before launch. Preserve sealed work and charges. Pass software qualification before dependent observed fits. Use receiver-only data for eligibility and keep the reserved sensor outcomes unopened until confirmation rules are frozen. Reproduction and study operation · Runtime status
Resume from the saved evidence
- Start with the verification commands. They check the 53-stretch NASA baseline, the saved forecast comparisons, the motion and carrier evidence, and the exact layouts for both training lengths in all seven reserved ESA groups.
- For ESA development, the fixed antenna response check gives a target for an installed phase calibration. A timestamped platform-state and orientation record and independent limits on shared receiver and forecast errors are still needed. The separate ground comparison covers all 120 matched seconds.
- In the RF04 antenna motion check, all six fitted offsets reached the 42 m airframe limit. Plausible course rounding and acceleration estimated from the sampled attitudes still leave some north discrepancies. The NASA aircraft text file repeats the one-second attitude and receiver data. The camera search found no timed images for RF04. The remaining leads are higher-rate original motion data and antenna installation measurements.
- After those development checks, qualify the aircraft error model and verify the frozen plan before scoring any reserved group. Keep numerical stops and abstentions in the denominator. Verify and publish the complete evidence with its source dependencies.
Development record
Detailed study record · Earlier roadmap and development checks · Plain-language next steps