Local Level Lab

Airborne measurements. Open methods.

Forecasts across twenty more airborne recording groups

9/20 groups have later north, east and height errors within the fixed earlier development reference. 9/20 pass the separate physical prediction screen; 11/20 cannot be scored because the later-cut fit did not pass its numerical check.

Recording IMU Latitude Duration Numerical status Within reference Physical screen
7df21c83… 21 71.9° 4.07 min abstain_inner yes yes
a953c8dd… 21 -62.3° 9.08 min abstain_inner yes yes
570b37d2… 21 -58.9° 7.30 min abstain_both — —
50f24131… 21 -61.2° 9.23 min abstain_outer — —
74ec8f62… 21 -61.2° 8.58 min matched yes yes
2791235c… 21 -56.7° 7.37 min abstain_both — —
f50ff54d… 21 -64.1° 9.13 min matched yes yes
370cec66… 21 -61.4° 9.22 min abstain_both — —
48c1bfe2… 21 -61.4° 7.10 min abstain_inner yes yes
a6e658d1… 21 -61.5° 9.03 min matched yes yes
2a56eb8f… 21 -62.2° 9.13 min abstain_both — —
bb8061a4… 21 72.6° 6.40 min matched yes yes
5a642167… 21 -61.3° 9.20 min matched yes yes
c69d0a93… 21 -58.8° 7.18 min abstain_outer — —
f66ab497… 21 -62.2° 9.33 min abstain_inner yes yes
8bf60391… 21 -57.1° 6.28 min abstain_both — —
fd7b81e4… 21 -61.6° 5.90 min abstain_outer — —
fad74da3… 21 -63.2° 5.53 min abstain_outer — —
e6629f14… 21 -62.7° 9.20 min abstain_both — —
dac266ab… 21 -59.1° 8.88 min abstain_both — —

These groups were selected without looking at the forecast outcomes, but they come from the same archive: this is retrospective development, not independent confirmation. The reference is a fixed earlier error comparison, not a confidence interval. This study checks one specified globe-plus-field forecast; it does not compare Earth shapes or calibrate a detection rule. Overlapping survey flights or installations cannot be counted as independent replications.

A GPS-only comparison uses these same groups and forecast cuts. The IMU forecast had smaller horizontal errors at all 18 cuts where a passing start was available.

The saved accuracy audit separately checks all 80 forecasts, including those whose fits failed to stop. Every one meets the fixed position-error screen. The nine accepted later-cut groups and original numerical outcomes stay unchanged.

Group metadata and forecast errors · Detailed forecast errors · All numerical starts · Source selection · Frozen method · Recovery procedure