Local Level Lab

Airborne measurements. Open methods.

Forecast adequacy across the remaining selected NASA groups

Use the 20-group outcome-blind inventory unchanged: one longest eligible stretch per conservative group not used by the original three-recording pilot or four-group transfer check. This is a retrospective development extension, not untouched confirmation. All 20 representatives are IMU21; 18 are southern. Keep those limitations in every report.

Repeat the same narrow prediction rule as the first four-group transfer: the specified-field globe, no upstream removal, header_elapsed clock, existing calibration bounds and weights, two earlier training cuts and two predeclared starts per cut. Choose among numerically passing starts by earlier training cost only. Forecast the next equal-duration receiver block before opening its positions for scoring. Preserve the earlier fixed three-recording directional RMS reference (5.092236 m north, 19.764265 m east, 10.778407 m up at stored precision) and separate physical screens: horizontal RMS ≤10 m, height RMS ≤30 m, maximum horizontal ≤50 m and maximum absolute height ≤150 m. Never change these values after fitting.

The grid is 20 groups × 2 cuts × 2 starts = 80 charged starts. Maximum 201 native calls per task, 16,080 total; packet visits use exact prepared packet counts. Four one-thread workers, cooperative wall limit six hours. The earlier 16-start run took 5,216 seconds on one thread, suggesting about two hours with four workers if work scales similarly. Prove source-bound qualification and task-level reboot recovery before launch. Charge before execution and reuse sealed successes and failures without restarting them. The 20 groups remain in the denominator even if numerical fits fail.

The first qualification request passed 12 software tests, but preparation stopped before reading originals because it required every historical source file to remain byte-identical. Twelve files changed since the sealed three-recording study: six ESA modules, two generated-noise modules, study runtime/testing plumbing, the shard loader and the NASA segment-inventory module. None is the rolling forecast evaluator or its numerical equations. The segment extractor's syntax tree is identical to the sealed version; the changed segment functions concern new inventories. The corrected gate requires this exact audited change set, verifies the unchanged extractor, and pins the current full source/environment in a new qualification request. Any further source change requires fresh qualification. No observed start was charged in the failed preparation.

Report each group's two-cut numerical status, forecast error and physical screen. This probes descriptive prediction transfer within the same archive. It does not compare globe against flat on these withheld paths, calibrate an aircraft error distribution, count 20 independent flights, or alter the original 53-stretch numerical result. Seven reserved ESA groups stay closed.