Local Level Lab

Airborne measurements. Open methods.

Where the ESA height forecast loses coverage

This saved-data check divides the two completed forecasts on the same ESA development recording into fixed 100-second bins. It makes no new fit and opens no reserved flight group. Signed errors below are predicted height minus receiver height.

Forecast period Heights inside nominal 95% range Mean raw height error Mean conditioned height error Mean conditioning adjustment Mean recorded climb rate
Shorter fit, reports 600–699 100/100 +0.19 m −0.15 m −0.33 m +0.28 m/s
Shorter fit, reports 700–799 100/100 −0.36 m −0.23 m +0.14 m −0.04 m/s
Longer fit, reports 800–899 25/100 −4.39 m +0.97 m +5.35 m +0.03 m/s
Longer fit, reports 900–999 0/100 −3.07 m +4.66 m +7.73 m −0.05 m/s
Longer fit, reports 1000–1099 0/100 +0.35 m +10.89 m +10.54 m −0.04 m/s
Longer fit, reports 1100–1199 0/100 +6.37 m +20.17 m +13.80 m +0.03 m/s

The first two rows use the fit to reports 0–599 and have almost identical values under both declared IMU error laws; the table shows the increment law. The last four rows use the earlier completed fit to reports 0–799. They are different forecasts on successive parts of one recording, not independent flights or a controlled comparison of the two fit lengths.

The later height error grows even though the receiver reports little average climb or descent. Mean ground speed rises from 92.4 to 95.4 m/s across those four bins. The uncorrected error changes sign, while the conditional adjustment keeps increasing in the same direction. The correction eventually makes the height forecast worse. This timing pattern is evidence that the current error-state extrapolation is inadequate over the longer horizon; it does not identify whether the source is sensor error, calibration, aircraft motion, clock interpretation or another modeling assumption.

The machine-readable bins include RMS, first and last errors, speed, climb variability, source hashes and the exact scored intervals. The shorter forecast result and earlier longer forecast give the full context. These are retrospective development diagnostics; nominal ranges are not calibrated confidence statements, and the scientific decision remains abstain.