The ESA forecast's uncertainty does not match its vertical errors
The earlier-conditioned forecast passed its preset position accuracy screen on development recording 187. A separate saved-data check now asks whether its declared uncertainty matches the 400 later GPS receiver reports. It does not.
| Later receiver component | Inside nominal 95% interval | Normalized error RMS | Predicted standard deviation, first to largest |
|---|---|---|---|
| North | 400/400 | 0.052 | 0.060–52.404 m |
| East | 400/400 | 0.091 | 0.055–50.868 m |
| Up | 25/400 | 6.275 | 0.151–3.556 m |
| All three together | 37/400 inside the nominal 95% ellipsoid | — | — |
The horizontal uncertainty grows very wide compared with the small horizontal errors. The later vertical receiver-minus-forecast error starts at −0.07 m and ends at −25.46 m, with a −9.17 m mean. Its declared uncertainty does not cover this growing difference. Adjacent normalized errors are strongly correlated, especially in height. The 400 rows are one flight segment, not 400 independent replications; these counts must not be used as a binomial confidence calculation.
The same weighted fit's uncorrected training-height RMS was 1.40 m. The later conditional-height RMS is 11.88 m. The mismatch thus grows after the training split; this comparison alone does not identify its physical cause.
A saved-only decomposition shows the direction of the problem. At the first later report, the uncorrected path is 4.20 m below GPS and the error law adds 4.28 m upward, nearly cancelling it. By the last report, the uncorrected path is 9.87 m above GPS, but the law still adds 15.59 m upward. That leaves a 25.46 m height miss. Across the 400 reports, the upward conditional correction averages 9.35 m. This identifies the wrong-way later correction in this recording; it does not establish why the model predicted it.
In the saved training section, GPS-minus-uncorrected-forecast height error had risen to +4.19 m by the split. Its final 200 receiver reports have a descriptive linear slope of about +0.98 m/min. The error law carried that upward correction forward. The actual uncorrected error subsequently changed direction and ended at −9.87 m. These slopes were examined after seeing the later result; they diagnose this recording and are not a frozen prediction rule.
The separate GPS receiver shows no abrupt motion change at that one-second split: ground speed is 92.175 m/s just before and 92.199 m/s just after; course changes by 0.010°. Over the surrounding 200-report windows, mean speed rises from 88.58 to 92.93 m/s and vertical-speed variation falls. This does not rule out a gradual motion or sensor-error change during the later section. The machine diagnostic records the receiver-only boundary values and their source hash.
This check uses the sealed forecast and original later receiver reports. It does not refit a model or change any declared noise level. All 400 saved covariance matrices are positive definite. The machine diagnostic records the exact quantities and source hashes. The fixed plan defines the calculation.
The covariance omits uncertainty in the earlier fitted calibration parameters and its error law came from generated controls. This result does not establish which omission or physical error causes the vertical mismatch. It blocks a calibrated uncertainty claim for this method. The seven reserved ESA flight groups remain unopened, and the scientific decision remains abstain.