The four repeat-turn forecast inputs are ready to bind to execution
All 12 staged files passed a saved-only hash check. Together they hold 1,600 training receiver positions, 480 later query times and 622,915 constructed inertial intervals. The prepared files total 26.9 MiB. They can be regenerated from the verified originals using the bounded preparation command. Later receiver positions are absent from the inputs.
Each window has exactly three files. One holds the earlier receiver rows, one holds the query times, and one holds the inertial increments. The preparer verified the full inertial arrays and the training packet prefix against the earlier timing receipt. Both IMU error descriptions can use the same input files.
Twenty focused checks passed across the material preparation, common forecast engine and shared recovery code. The recovery tests verify that resumed tasks skip sealed results, retain charged work and reject changed source or inputs. This is verification of the shared infrastructure. The repeat-turn forecast adapter and its end-to-end interruption check still need their own execution qualification.
The planned development comparison uses the reference model from the earlier covariance study and two fixed starts per IMU description in each window. It tests errors through a turn without attempting a new Earth-model decision. The execution manifest must bind the fit and recovery allowances and seal forecasts before the later positions can be decoded for scoring.
Plan and reproduction · Preparation freeze · Prepared input hashes · Scoring qualification