The repeat-turn scoring calculation passes its software checks
The scorer accepts a later receiver path only after verifying the forecast seal and matching every timestamp. The seal covers the earlier training identity, forecast values, native covariance and measured angular exposure. The later receiver positions enter only through the scoring interface.
The four covariance choices use the same sealed path. The native scales come from the earlier 200/120 development forecast. Separate 0.001 m/s² working terms test steady acceleration and a 15-second maneuver response, alone and together. Neither term is estimated from the later positions. The same covariance rule applies to opposite turns because it allows horizontal errors in either direction.
All four source-bound checks passed. The implementation agreed with an independent dense Gaussian calculation. It rejected tampered bytes and changed timestamps, and preserved the covariance when a generated turn was reversed. In 4,096 generated position-error draws, the combined term met the declared joint reference check near 95% and had the best mean log score among the tested choices. The simulation generated errors from that covariance deliberately. Aircraft coverage, numerical fit completion and the training-only forecast workflow still need to be verified on their own terms.
The next execution step is to bind a fixed forecast method to the four input receipts, qualify task-level interruption recovery and predeclare its finite start and evaluation allowances. Later receiver positions remain sealed until verified forecast outputs are available.
Plan and reproduction · Source-bound qualification · Test report