Local Level Lab

Airborne measurements. Open methods.

Finite ESA training-source sensitivity refit

Question: do centimetre-scale changes in training receiver positions alter the saved 400-training/120-later model ordering on the opened ESA development recording? The two alternate 400-row inputs are fixed in training material. Both use the original air1 velocity, quality and covariance fields so only the training coordinates differ.

Run six matched fits: mosaic03 and pwrpak7 training positions × specified-field globe, zero-field globe and flat disc. Use only the existing profiled-removal, increment-error setting and original primary start 0. Keep the same raw IMU prefix, model method, 400/120 split, numerical bounds, 200-evaluation limit and 700,000 native-call/45-billion packet-visit ceiling per task. Four workers, one numerical thread each, maximum 7,200 seconds. The earlier 24-fit matrix took 10,357 seconds with four workers; six fits are expected to take roughly 45–90 minutes. This is a finite development sensitivity, not a new frozen confirmation campaign.

The worker must have task-level recovery and source-bound qualification before launch. Prepay calls before execution, preserve completed successes and numerical failures, and never rerun a sealed task. Later receiver positions are absent from all fit inputs. After closure, score the same 120 later air1 receiver reports and compare with the original saved matrix. If any required fit fails its original numerical stopping check, report that setting unresolved. No selection, method or threshold may be changed in response to the outcome. Seven reserved ESA flight groups remain closed.