Alternate receiver positions are ready for a bounded refit test
The training-only preparation
matched the first 400 reports of the opened ESA development flight to
both parallel GNSS-only PPP exports. The original air1 positions agree
exactly with the sealed parent input. Only latitude, longitude and height
were changed; velocity, quality fields and the original covariance were
retained to isolate coordinate choice. The source files were hash-checked,
but later positions were not decoded or staged for fitting. Two local
coordinate controls pass. A separate source-bound audit
compares the staged rows with the original matrix's actual training input:
all 400 rows in each export match in every non-position field. Its two
preservation tests pass.
| Replacement training positions | RMS change, north/east/up | Largest change, north/east/up |
|---|---|---|
mosaic03 |
1.24 / 1.58 / 2.76 cm | 3.17 / 2.37 / 6.11 cm |
pwrpak7 |
0.72 / 0.69 / 3.49 cm | 2.39 / 1.71 / 6.49 cm |
Both complete 400-row alternatives, their hashes and the source bindings are in the 68 KB compressed training material. This is input preparation, not a refit. The existing fixed-forecast check held calibration constant; these inputs enable a separate test of whether small changes to training positions move the fitted calibration or later model ranking. The separate six-fit result has now closed: all six fits pass and both alternate training sources retain the same numerical model ordering on the fixed later positions. Neither the relative PPP comparison nor the staged training inputs establish absolute receiver accuracy. The seven reserved ESA flight groups remain closed.