Receiver-projection qualification sequence
The studies run sequentially. A passing local-stability qualification is required before full-calibration controls start. Each stage has its own immutable finite allowance; no failure is retried.
| Stage | Passing fits | Passing paired starts | Outcome |
|---|---|---|---|
| Local projected stability | 24/24 | 11/12 | not qualified |
| All 26/27 calibration columns | pending | pending | blocked by failed qualification |
These are generated-motion software controls, with zero original-recording reads or observed-data fits. Passing does not establish scientific significance or alter the 53 globe / 0 flat / 0 unresolved archival comparisons.