ESA paired tangent check
21/24 paired cases passed; the method substitution did not qualify.
The same prepared development measurements and fitting source were used for both calculations in each pair. The tangent method was the within-pair change. This checks software behavior on one recording, not an independent Earth-model detection.
The original allowance closed with 14 passing pairs and 4 technical interruptions. A separate, finite continuation reserved the missing identities without refitting sealed results. The complete attempt ledger records 4 technical interruptions.
Pairs that did not pass
| Case | Reason |
|---|---|
| flat_still-0-reported-short-v1-1 | at least one matched numerical fit did not qualify |
| flat_still-0-reported-persistent-v1-0 | Forecasts differ by 0.016715 m; fixed limit 0.01 m |
| flat_still-1-reported-short-v1-0 | at least one matched numerical fit did not qualify |
Training-cost primary starts agree in 7/10 complete groups.
All 24 paired outcomes · Every charged attempt · Original plan · Audit method.