Question

Can the selective-precision tangent replace the wide tangent in the recording-187 development fitter without changing its training-only prediction boundary, numerical decisions or later positions, when both use the same current source and prepared measurements?

Frozen comparison

Use the 24 case identities and exact prepared measurement bytes of the completed ESA wide pilot: one selected twenty-minute recording-187 interval, three physical candidates, two processing settings, two working receiver-error policies and two declared starts. Keep 800 earlier receiver positions for fitting and 400 later positions for scoring. Preserve all measurements, starting values, optimizer, 200-evaluation per-fit ceiling, physical bounds, gravity anchor, stopping checks, accuracy screens and training-only primary selection. Run wide and selective fits for each case under one newly frozen source and environment. The tangent loader is the only within-pair difference. The old wide pilot is a historical result, not the substitution reference: 14 files in its frozen source closure have changed in the live tree, including the training-and-forecast function. Reusing its 22 fitted outcomes as if they came from today's source would confound this check. Read no original aircraft file or protected ESA confirmation group.

Require the published wide observed pilot and both completed generated long-fit studies as source/input/environment-bound parents. Qualify a new standalone adapter before preparing the study. Reuse the wide pilot's prepared input bytes; hash and compare every copied input. Freeze new source and environment hashes, the parent completion hashes and the unchanged source protocol. Use four workers with one numerical thread each and a sixteen-hour cooperative wall ceiling. Each of the two fits in a task permits at most 201 native calls and 38,810,753,600 packet/query visits; across 24 paired tasks the ceilings are 9,648 calls and 1,862,916,172,800 visits. Charge before execution. Do not retry a completed or failed task, expand an active allowance or alter the existing pilot's failures.

For each completed new pair, compare the two saved training costs, convergence, all active columns, training-only input binding and every later three-dimensional position. Report the historical 22 qualified wide starts separately, without using them to decide whether the substitution works. The largest position difference may be at most 0.01 m. The fixed training-cost selector must choose the same primary start in the two new paths wherever both starts qualify. Report all differences and every new failure. The two old deadline failures remain unchanged. A complete substitution gate requires all 24 new pairs to finish and meet the fixed tolerance, with identical numerical and physical-adequacy classifications. This is a software-method check on a development recording, not an independent Earth-model replication or calibrated detection.

Sequence

  1. Build a small paired observed evaluator that calls the existing shared fitting and scoring components with explicit tangent loaders. Do not copy an entire historical worker tree or patch a process-wide module.
  2. Test exact input reuse, source and environment binding, complete nuisance columns, later-position isolation, charge limits and frozen-file direct loading. Run the source-bound qualification before study preparation.
  3. Run the finite 24-pair study, independently replay all saved results and matched comparisons, then publish every outcome and update the roadmap.