Physical evaluation of the saved timing-cell proposals
Completed 4/4 points and 18/18 proposals using 26 evaluations. Every physical timing side and saved spacing is retained. No model was refitted or previous label changed.
| Point | Original fit passed | Proposals | Evaluations |
|---|---|---|---|
| 1 | True | 3 | 5 |
| 2 | True | 3 | 5 |
| 3 | False | 6 | 8 |
| 4 | False | 6 | 8 |
Cost, stationarity and actual position-change screens are reported separately. Passing them here does not qualify a complete optimizer or establish statistical confidence.
Point summary · All proposals · Frozen plan · Next analyses.