Full-size observed-input preflight
4/4 technical tasks passed. The sealed study is complete.
This check constructs prediction-error operators on the prepared ESA development recording. It does not fit an Earth model, score withheld receiver positions, or test the seven reserved ESA groups.
| Supplied error law | Prediction target | Result | Native calls used | Operator storage | Elapsed | Peak worker memory |
|---|---|---|---|---|---|---|
| increment | physical_position | passed | 601895 | 6.7 MiB | 27.4 min | 0.21 GiB |
| increment | receiver_measurement | passed | 601895 | 6.7 MiB | 27.4 min | 0.21 GiB |
| point | physical_position | passed | 601895 | 10.0 MiB | 27.5 min | 0.22 GiB |
| point | receiver_measurement | passed | 601895 | 10.0 MiB | 27.5 min | 0.22 GiB |
All four technical constructions passed. This permits a separately frozen observed development study; it does not calibrate prediction coverage or support a scientific decision.