Local Level Lab

Airborne measurements. Open methods.

Generated changing-drift pilot

Question

Can one fixed, time-correlated position-error law describe forecast errors produced by the independent generated IMU and receiver streams? This is a development stress check, not an ESA or NASA aircraft result. Failure would rule out this fixed candidate as a complete forecast law even when the initial physical state is supplied exactly.

Frozen cases and split

Use eight distinct seeds, 2026111600 through 2026111607. Even-numbered seeds include the generator's physical vibration; odd-numbered seeds omit it. Each case lasts 120 seconds at 100 IMU samples per second. Receiver reports are at integer seconds. Condition on reports 0–60 only; score reports 61–120 afterward. Keep the generator's white gyro/force errors, changing biases, shared gyro/force error and receiver white/random-walk errors. Do not fit any Earth model, choose a seed after scoring, or inspect an aircraft file.

Use the candidate law's fixed scales below, derived from the generator's declared process amplitudes before seeing these draws:

Quantity Fixed value
White acceleration intensity (0.01² + 0.02²) / 100 = 5e-6
Changing-acceleration intensity 0.0003² + 9.80665² × (0.0001² + 0.0002²) / 100
Receiver random-walk intensity 0.01² = 0.0001
Receiver white standard deviation 0.03 m per axis
Initial receiver-offset standard deviation 0.01 m per axis
Initial inertial position/velocity/acceleration uncertainty zero (truth supplied)

The gyro-bias random walk and motion/processing mismatch are not fully represented by this law. That is an intentional adversary; the pilot must record any forecast miscoverage rather than silently enlarge a parameter after seeing it.

For each draw, save training residuals, earlier-conditioned forecast mean and scale, later errors, the largest absolute standardized later error, marginal 95% fractions and whole-period 95% containment. Count each seed once, not each receiver epoch as an independent trial. Numerical completeness is the only technical pass criterion; no coverage or scientific pass is declared from eight draws.

Freeze the code, policy, Python/NumPy/SciPy environment and eight task IDs before launch. Each task is limited to 12,000 generated IMU packets, 121 receiver reports, zero native calls, zero Earth-model fits and one start. Use one numerical worker/thread and a 10-minute original wall allowance. Qualify and freeze task-level recovery before launch. Preserve completed failures; only unfinished technical work may continue under a separately charged finite allowance. The seven reserved ESA flight groups remain closed.