Matched ESA weighting control implementation plan
Goal: Determine whether the newer code still produces an accurate training-only forecast when it fits the same development recording with the earlier receiver-only weighting.
Architecture: One separately frozen observed fit reuses the exact interval,
800 training receiver rows, 400 later query times, model, bounds, clock and
start from the completed six-fit study. It calls the current shared
train_and_forecast path with training_error_factory=None. A saved-only
report scores the forecast against the later receiver rows only after the
fit and forecast seal, then compares it with the earlier accurate pilot and
the sealed new IMU-error fit. No reserved confirmation group is an input.
Files: analysis/lll/esa_weighting_control_study.py owns the one-task
definition and evaluator; analysis/lll/esa_weighting_control_report.py
owns the saved-only comparison; focused tests live in
analysis/tests/test_esa_weighting_control_study.py and
analysis/tests/test_esa_weighting_control_report.py. The result and next
gate belong in this directory and the public roadmap/index.
Frozen scientific choices
- The source is the prepared ESA recording-187 interval with 360,028 increments and 1,200 receiver times. The first 800 receiver rows train; the last 400 are withheld until the forecast seals.
- Use the original linear-point increments,
sphere_rotating, no upstream removal,reported-short-v1, start zero, packet-header elapsed clock, inverse-square height gravity, the same 26 bounds and a 200-evaluation cap. - Use the receiver-only dense working covariance. This is an observed-data development control, not a calibrated choice between error laws.
- One task, one worker, one numerical thread, one start, no retry. Freeze a finite 201-native-call, 45-billion-visit ceiling and a four-hour cooperative wall allowance before launch. Preserve charges and any failure.
- The task is a technical pass only when the fit and forecast are complete and numerical checks pass. Physical accuracy is scored separately against the preset 10 m horizontal training and later RMS screen. Neither outcome promotes a scientific decision.
Implementation steps
- [ ] Add tests that reject unqualified preparation, changed source/input bindings, any later receiver row in the worker, and a missing sealed comparator. Run them and confirm failure before implementation.
- [ ] Implement the one-task study using
lll.studies, the existingesa_fixed_rate_protocol.material, and shared training/forecast functions. Reuse the sealed six-fit study's input bytes; do not copy its worker. - [ ] Qualify the source-bound worker and interruption recovery. Freeze its inputs, environment, allocation and finite charges, then run once.
- [ ] Build a saved-only report that verifies the closed task and both historical comparators before reading the later receiver rows. Report fit status, physical errors, parameter differences and absolute adequacy.
- [ ] Update the public roadmap, study index and overview with the verified result and the next gate. Preserve all prior results unchanged.
The seven reserved ESA flight groups stay closed. A failed fit or accuracy screen is a result to report, not a reason to alter bounds, timing, noise levels or allowances.