Local Level Lab

Airborne measurements. Open methods.

Turning-route fixed-point numerical probe, corrected worker path

The first frozen attempt ended before any native call because the worker looked for the sealed geometry parent under its own study directory. Both technical failures and their zero native charges remain in that first study. This second, separate study resolves the project root explicitly from the exact worker study directory. A focused software check covers the correction.

The question, two generated turning points, unchanged parent fits and input hashes, ten-sweep fixed-point protocol, frozen source/environment, two one-thread workers, 20-minute cooperative wall limit and interpretation are otherwise exactly those stated in the first plan. There are no optimizer starts, observed recordings, protected ESA groups, new Earth-model decisions or changed acceptance thresholds. The new task and recovery qualification must pass before preparation. An interrupted task is recoverable only under its separate finite charge; a completed failure remains a failure.