Local Level Lab

Airborne measurements. Open methods.

Earlier-origin conditional forecast

After both 400/120 fit tasks close, rebuild each passing fit's declared receiver/IMU error operator over the same 520 prediction times. Use only receiver reports 0–399 to condition that operator. Replay the exact saved training cost and covariance log determinant before accepting a forecast. The 120 later receiver positions must not be present in this study's inputs.

Use the already selected ESA development recording, specified-field globe, header-elapsed clock, original calibration bounds, original fixed IMU error law and saved fitted parameters. Run one fixed-law conditioning task for each passing increment or point-rate fit; do no optimization and do not silently replace a failed fit. Each task has at most 450,000 native calls and 1,000,000,000 packet visits, charged before execution. Reserve one numerical thread per worker and no more than two workers, with a two-hour original wall allowance. Qualify source, environment, prefix replay and reboot recovery before launch. Preserve interruptions and numerical failures.

Save the uncorrected forecast, earlier-conditioned receiver mean and complete future covariance before reading reports 400–519. Only after both tasks close may a separate scorer open those positions. Report per-axis errors and nominal interval coverage as development diagnostics. No calibrated coverage, physical adequacy or Earth-model decision follows from this one recording. The 120-report duration was selected after earlier outcomes were known, and the seven reserved ESA groups remain closed.