Earlier-origin error development check
Question
Does the existing specified-field globe calculation transfer across a different part of the same opened ESA flight? Fit on receiver reports 0–199, then predict reports 200–319. This tests how much the favorable 400/120 forecast depends on its start time. It cannot calibrate coverage or confirm an Earth model because the two windows share a flight and instrument.
Fixed design before fitting
- Reuse the verified prepared recording-187 inputs. No original download or reserved confirmation group is opened.
- The fit receives only the first 200 receiver positions. It receives IMU increments through report 319 and the 320 report times. The 120 scoring positions remain outside the fit worker until both laws have sealed.
- Fit the specified-field globe with the unchanged header-elapsed clock,
physical bounds, single start and 200-evaluation stopping rule. Run both
existing
incrementandpointerror laws; do not select one using its future error. - Allow two workers at one numerical thread each, with at most 700,000 native calls and 45,000,000,000 packet visits per fit. The original study wall ceiling is two hours. An interrupted unfinished task needs separately frozen recovery with unchanged scientific inputs and charged starts.
- Require source/environment qualification, a generated split test, a reboot/interruption recovery test and hash-bound inputs before launch.
- Only after both fit tasks close, score signed north/east/up errors, horizontal/height RMS, numerical convergence, active bounds and nominal interval coverage. Report every failure. The decision remains abstain.
The saved-input preflight establishes the 200/120 boundary. The prior 400/120 check is retained unchanged. A matched earlier-origin comparison can guide the next error-envelope design, but neither window establishes performance on a different aircraft flight.