Training-only refit under three ESA rate interpretations

Fixed question

Can any of the three plausible conversions from reported ESA iMAR rates to increments give an adequate training fit and later prediction on development recording 187, after the same complete nuisance model is refitted using only earlier observations? The fixed-point check shows 19–43 m later horizontal trajectory sensitivity, so a fixed fitted point cannot settle this question.

Use the saved 360,029 reported rate samples and original 800/400 receiver split. For each of left hold, right hold and linear points, fit both original IMU error laws (increment and point) under the same sphere_rotating model, processing assumption, header_elapsed clock, 26-parameter bounds, training-only receiver error policy, start 0, numerical stopping rule and 200-evaluation ceiling. This makes six predeclared tasks. Recalculate each method's initialization from its own earlier increments and receiver rows; use no later receiver positions until all six fit/forecast artifacts seal. The original linear-point fits and forecasts must be reproduced within a predeclared numerical tolerance before the alternatives are interpreted.

The result is development prediction adequacy, not an Earth-model test. Report every numerical failure. For every completed fit, report training and later horizontal/vertical RMS and maxima, active bounds and stop reason. Apply the same preset physical accuracy screen to all six. Do not choose the instrument convention from later error, and do not treat the minimum training cost among six variants as a calibrated selector. The seven independent ESA confirmation groups remain unopened.

Qualification, finite budget and recovery

First run a short generated six-task control that reproduces the original linear-point saved fit/forecast and checks that later receiver rows cannot reach training. Qualify the three input constructions, source/environment bindings, finite accounting and task-level interruption recovery before observed preparation. Keep each task separately sealed so a reboot does not repeat completed work. An interrupted task may receive at most one additional separately charged start under unchanged scientific inputs and method; a completed numerical failure is never retried.

The observed study will use at most three workers, one numerical thread each. Its initial finite allowance is one start per task, at most 700,000 native calls and 45 billion packet/query visits per task, with a cooperative four-hour wall cap for the whole initial study. Those ceilings accommodate the 200-evaluation numerical limit and the measured 601,895-call cost of a full saved ESA error-operator construction; they are not expected consumption. Across six initial tasks the ceiling is 4.2 million calls and 270 billion visits. Recovery has a separate at-most-six-start ceiling, only for tasks left technically unfinished, and no permission to retry a sealed failure. The recovered total ceiling is therefore 8.4 million calls and 540 billion visits. Source, numerical environment, original bytes, task IDs, charge journals and outputs must remain hash bound and reboot verifiable.

The frozen study may finish with abstention. It must not relax the physical accuracy screen or promote any result to the protected groups just because a different rate interpretation fits better.