Local Level Lab

Airborne measurements. Open methods.

Observed prediction development pilot

Question

On the already selected ESA development recording, can the two supplied IMU error laws be carried through a complete earlier-only fit and a forecast that covers the withheld receiver period? This is a development check of prediction and error assumptions. It is not an independent Earth-model test.

Fixed input and first stage

Reuse prepared recording 187 and its saved 360,028 IMU packets and 1,200 receiver epochs. The first 800 receiver positions train the fit; the final 400 are opened only after both law-specific forecasts and both target interval unions are saved. Use the same 239,867-packet training prefix, packet-header clock, reported-short receiver policy, height-gravity anchor, no upstream Earth-rate removal, specified-field globe candidate and start zero as the completed technical preflight. The two supplied increment and point error laws retain their generated-study numerical levels. They are assumptions, not measured instrument limits.

The first stage has one task containing two matched fits, one per supplied law. It records all numerical failures and boundary checks. It scores only the withheld receiver observations. The archive contains no known true physical aircraft path, so the physical-position interval is saved as a diagnostic but receives no coverage score. A fit that predicts an implausible height fails the fixed physical adequacy screen even if its horizontal error is small.

Finite allowance and recovery

The first-stage worker may start each law once, with at most 200 fit evaluations per law. Its ceiling is 3,000,000 native calls, 80 billion packet/query work units, eight hours of cooperative wall time and one numerical thread. These conservative ceilings include the two full-history error targets per law; the 27.5-minute no-fit preflight measured their construction cost. At least 35 GiB must be free at launch. No automatic scientific retry or increase to a running allowance is permitted.

Before launch, pass a short source-bound generated worker control, the source/environment qualification and a finite task-level interruption recovery test. The worker must be reboot-resumable without refitting a sealed result. An interrupted unfinished task may continue only through a separately charged, prospectively qualified continuation under unchanged scientific inputs and methods.

After this stage

Audit the sealed result without a refit. A technical pass permits a separately frozen matrix covering all three physical candidates and the other already designated development recordings. That later matrix must preserve shape-first interpretation, both processing assumptions where declared, all failures and the seven reserved ESA confirmation groups. The present first stage cannot establish observed prediction coverage, scientific significance or a model winner by itself.