Long clean forecast control
The single frozen 900-second clean task completed. Known sensor corrections and the true initial state were supplied; no parameters were fitted. Only reports 600–899 were scored against later analytic truth.
| Stream | Future horizontal RMS (m) | Future vertical RMS (m) |
|---|---|---|
| Clean | 0.035 | 0.322 |
| increment noise | 59.66 | 31.93 |
| point noise | 637.12 | 7.14 |
The long clean propagation is close to the analytic trajectory. The large drift in the two noisy-stream controls therefore appears only when random IMU errors are injected into this software setup. That does not identify which error component causes it or establish a measured ESA error law. The seven reserved ESA confirmation groups remain unopened.
The machine-readable report contains exact scores and evidence hashes.