Whole-forecast bound on two generated paths
A saved-data audit expanded the two closed generated forecasts to cover all 900 later coordinate values at once under the stated affine, known-Gaussian, in-box calibration model. It made no new fits and read no aircraft recording.
| Generated IMU error law | Median marginal span N / E / up | Median whole-forecast span N / E / up | Generated truth inside all later intervals |
|---|---|---|---|
| Increment | 108 / 102 / 22 m | 133 / 128 / 26 m | 300/300 epochs |
| Point | 108 / 102 / 22 m | 133 / 127 / 26 m | 300/300 epochs |
The shared calibration allowance remains 0.025. Dividing the future-noise allowance of 0.025 among 900 coordinates raises its normal quantile from 2.24 to 4.19. A union bound then gives a nominal 95% simultaneous lower bound under those supplied assumptions, even when later errors are correlated. No empirical coverage rate follows from two covered examples.
Both fitted point paths still fail the original 10 m physical accuracy screen. The wider intervals can contain truth despite those large misses; they do not make the fitted trajectories physically adequate. Nonlinear forecast error and the real aircraft's error law remain unqualified. No Earth-model decision follows. The seven reserved ESA flight groups remain closed.