Compare inertial forecasts with GPS-only extrapolation at four cuts
Use the four training cuts of the height-error check on ESA development recording 187. Score the first 120 receiver reports after each cut. Use both inertial error laws and report the original raw horizontal and height RMS. Use both GPS-only controls already defined for the 400-report cut. One holds the last receiver velocity constant. The other estimates course change from exactly 60 earlier velocity reports and holds the turn rate, speed and vertical velocity constant.
Reuse the sealed 400-report control result. For the other three cuts, store the two GPS forecasts before opening their later receiver positions. Retain every cut and both GPS rules. Compare errors by axis without selecting a preferred rule or changing the original accuracy outcomes. Check that the source clocks and receiver sequences match the original forecast inputs.
Use three task identities, two charged extrapolations each, one numerical thread and a 90-second cooperative limit. Use zero new navigation fits, native integrations, original-file reads or reserved-flight reads. This development comparison measures improvement over two specified baselines on one flight. It leaves absolute adequacy, gyro-only attribution and independent-flight prediction coverage open.