Check all twelve ESA windows on the raw forecast scale
The first accuracy audit scored the released turn and steady paths after adjustment using earlier GPS errors. Its four rolling paths were raw. Preserve those scores and evaluate the archived raw paths for the same eight turn and steady forecasts. Use the same chosen starts, 120 later receiver positions and four accuracy limits. Reuse the completed raw scores at the four rolling cuts.
For each turn and steady window, check both inertial error laws and report the raw and adjusted horizontal and height RMS, their peak errors and the four limit flags. The archived raw path must be the full prediction from the same earlier fit as the released adjusted path. It must share the original receiver clock and contain no later GPS position corrections.
Use eight task identities, 16 charged checks, one worker and one thread with a 90-second cooperative limit. Reuse the first audit's frozen GPS positions. Use zero new fits, native calls, original-file reads or reserved-flight reads. These comparisons share one development flight and leave aircraft uncertainty uncalibrated.