Trace the growth inside the propagated position bound
The four recorded checkpoints put most of the growing allowance in the propagated position term. That term sums contributions from residual velocity, the changing map from local motion to geographic coordinates, and the uncertain clock. Trace these separately before choosing which bound to tighten.
Reuse the two sealed prefixes, four query times, earlier-only reference and all calibration ranges. In each packet, use the existing rate and duration terms to record the three contributions to the position remainder. Track the initial offset and arithmetic difference separately. Clone the running totals when a query forks from the shared prefix so overlapping packets are counted once in each report. Keep the numerical calculation unchanged. Require byte-identical continuation bounds, identical packet-work counts, and reconstruction of the recorded accumulated departure remainder at each checkpoint within one nanometre after conversion to metres.
Allow one bound and up to 6,400 packet steps per candidate, two one-thread workers, 480 seconds per bound and 550 seconds overall. Use the existing technical recovery qualifications. This is bookkeeping for an upper bound. It measures neither actual forecast error nor the size of a true physical effect. No new fit, measured position or reserved flight is used.