Update the development flight’s carrier error budget
Use only the six pinned reports from development flight 187. Rebuild the projection of the saved model-score weights onto the actual 120 one-second Nuuk Museum intervals. Check it against the sealed projection and compute separate sensitivity coefficients for the covered and uncovered directions. Use the original aircraft ranges without a ground correction. The ground correction learned on earlier data did not materially change those ranges.
Keep the prior illustration of a one-metre anchor error per coordinate, two millimetres RMS in uncovered carrier directions, and the constructed acceleration cap from the original score study. Use the exact geometric remainder calculation at those caps. Calculate the largest covered-direction RMS error allowed by the score gap. Compare that limit with the same budget at Qaqortoq’s coverage. These caps are illustrative. Require separate evidence for the actual aircraft caps before a decision.
Perform one deterministic verification on 240 saved half-second intervals with at most 2,496 stored values. Use one numerical thread. No fits, original measurement processing, or reserved flight reads are authorized. Preserve the original budget. The revised receipt must reproduce byte for byte from the pinned reports and record the missing caps explicitly.