Apply the full earlier-fit loss to the ESA calibration ranges
Use the eleven surviving ranges from the graph-cut check. Keep all 60 coordinates, the 0.01 increase allowed in earlier squared loss, the previous static constraints and the checked graph and earlier-loss cuts. Keep the 25.41-unit forecast gap and every earlier witness and exclusion.
An earlier full-loss solver stalled on most boxes. Here, first select a direction in which the archived earlier residual changes little across each box. Use the saved receiver operator to enclose its range with outward arithmetic. Subtract only the squared energy guaranteed along that direction. First minimize the squared residual in the perpendicular space. Then propose the largest forecast change under its remaining loss limit. Use bound-scaled coordinates and analytic derivatives. Limit each proposal to 128 distinct residual evaluations.
For either point, take its calculated earlier residual direction and remove its component along the energy already budgeted. Bound the perpendicular part on the remaining residual ball. Use the saved earlier operator and exact projection arithmetic to enclose the coefficient range. Add the necessary linear constraint and use the two existing exact certificate calculations to bound the forecast score. If a projection alone contradicts the whole linear region, require a separate exact lower certificate before excluding the range. Check all feasible witnesses. A numerical stopping status never certifies anything.
Retain the best checked bound, including the previous one. Report which ranges shrink or are excluded and whether the combined bound falls below the forecast gap. This still bounds the archived affine prediction and its calibration representation. The nonlinear integration remainder and real aircraft uncertainty need their own checks.
Freeze eleven tasks, three one-thread workers, 360 seconds and two numerical proposals, three projection checks and at most four linear programs per range. Bind the tested shared recovery policy with a 600-second recovery allowance. Run zero new trajectory fits or integrations. Use no later receiver positions or reserved recordings.