Local Level Lab

Airborne measurements. Open methods.

Receiver shift needed to tie sealed forecast scores

Use only the sealed 400-training/120-later ESA development matrix, its saved parent receiver cut and the completed alternate-PPP score receipt. Consider the two settings in which all three required model fits passed the original numerical checks. Read sealed future forecasts; run no fit or native forecast. Keep the original air1 receiver-coordinate metric fixed on the 120 later epochs. Reproduce the saved model scores exactly before calculating margins.

For each preferred specified-field globe forecast against the zero-field globe and flat-disc forecast, calculate the smallest arbitrary 120-by-3 receiver-position perturbation that would make their fixed Euclidean sum-of-squares scores tie. Also calculate the smallest single constant north/east/up offset applied to every later epoch that makes them tie. Report these as per-epoch RMS displacement and constant-offset magnitude, with horizontal-only variants. Verify the formulas against an exact known-answer case and by applying the computed shift to obtain a tie.

This is a diagnostic sensitivity bound, not a receiver error estimate or a calibrated model test. Forecasts and the local coordinate metric are held fixed. Changing coordinates, reestimating calibration or accounting for shared receiver error may change the answer. The 120-epoch horizon came from development work on this one flight. The seven reserved groups stay closed.