Local Level Lab

Airborne measurements. Open methods.

Does the opened-flight forecast ranking depend on the PPP export?

Use the already sealed 400-training/120-later ESA development matrix. The model fits and primary starts remain chosen from air1 training observations alone. Reuse only its two complete, previously reported settings. Read no IMU original, perform no fit or native forecast, and leave the two incomplete settings unresolved.

Hash-check the saved model artifacts, the parent air1 520-report cut, and the completed full-flight PPP comparison. Match those 120 later air1 reports exactly to the raw air1 export. Strictly parse the mosaic03 and pwrpak7 PPP exports with the previously verified single printed-counter rollover, match within 2 ms and apply the existing first-order velocity/time correction. Use only epochs common to all three exports so every physical candidate and PPP source is scored on the same withheld times. Require at least 100 common reports; otherwise preserve a failed diagnostic.

Report north/east/up, horizontal and total RMS for each selected forecast against each PPP export, then the lower-error globe/flat family and the specified/zero-field ordering conditional on globe. Preserve the original air1 score and all source/artifact hashes. The fixed physical accuracy screen remains a separate descriptive flag; no statistical threshold is introduced.

This tests robustness to PPP processing choice on one already opened flight. The exports share an antenna and geodetic coordinate convention, so their agreement cannot establish absolute geometry or scientific independence. The 120-report horizon was originally chosen after earlier development results; this is not confirmation or calibrated detection. One local thread, no protected ESA group reads.