Matched ESA development forecasts
24/24 fit tasks closed; 2/4 settings have all three training-selected forecasts.
| Processing case | IMU error convention | Complete | Lower-error shape | Preferred fit adequate? | Background-field comparison |
|---|---|---|---|---|---|
| Zero removal | increment | No | Unresolved | Unavailable | Not assessed |
| Zero removal | point | No | Unresolved | Unavailable | Not assessed |
| Profiled | increment | Yes | globe | Yes | specified_field |
| Profiled | point | Yes | globe | Yes | specified_field |
These are numerical comparisons on one already opened development flight, with no later receiver position in fitting. The horizon was chosen after earlier outcomes were known. Fit convergence and physical accuracy are reported separately; no aircraft error range or scientific decision is calibrated. The seven reserved ESA flight groups remain closed.