Local Level Lab

Airborne measurements. Open methods.

ESA development continuation: withheld prediction

The separately frozen continuation finished its one task on development recording 187. It reused the two saved fits, completed the missing receiver error bound, and scored 400 later receiver positions. It made no new fit and opened none of the seven reserved ESA confirmation groups. The parent pilot's exhausted allowance and technical failure remain recorded.

Check Saved result
Completed tasks 1 of 1
Training / later receiver positions 800 / 400
Training horizontal error, either error law about 40 m RMS
Later horizontal error, either error law about 249 m RMS
Later maximum horizontal error about 390 m
Preset training and later horizontal limits 10 m RMS; 50 m maximum
Later receiver readings inside calculated coordinate intervals 400 of 400 on each axis

The two error laws give nearly identical forecasts and neither is selected by the training-only law check. Both forecasts fail the preset horizontal accuracy limits on training and later positions. The intervals are conditional on an assumed error-law family and calibration box; their apparent coverage here is not a calibrated success or a substitute for an accurate forecast. Physical aircraft-position truth is unavailable. The result is abstain, with no Earth-model conclusion from this development recording.

The next gate is to diagnose the horizontal miss from saved training and forecast artifacts, then qualify any revised prediction method on generated controls before another observed fit. The seven reserved groups stay closed. The saved error-trend audit finds that east error grows by about 41.6 m/min over the withheld period; it does not identify a cause.

The sealed study is data/prediction-observed-development-continuation-v1-20261113. Its completion binds manifest SHA-256 2dbbd77362e7d21cad709f0a1001173ac99b44c3ea30e7021b6ce513de1e9788 and summary SHA-256 1add15ded2e8c72e204dee11086833ebaea9b6c4c0a8e69d1fa82be4f2b5bc6d. The saved-only reporter checks those artifacts without calculating a new fit or forecast.

Fixed continuation plan · parent pilot.