Four-group forecast-error transfer
3/4 groups have second-cut north, east and height RMS errors within the fixed three-recording development reference. 3/4 pass the separate fixed physical prediction screen; 1/4 cannot be scored because the second-cut fit did not pass its numerical check.
| Recording | IMU | Latitude | Duration | Second-cut result | Within reference | Physical screen |
|---|---|---|---|---|---|---|
b365bdf3… |
8 | -63.1° | 9.75 min | abstain_both | — | — |
b4ab6e12… |
21 | 75.3° | 6.88 min | abstain_inner | yes | yes |
c16df82d… |
21 | -63.7° | 10.80 min | matched | yes | yes |
2f7e37c4… |
21 | -60.9° | 9.42 min | abstain_inner | yes | yes |
The reference is the maximum earlier forecast error from three prior development recordings under one declared clock and processing case. It is not a confidence interval. Four retrospective groups cannot establish a rare failure rate, calibrated Earth-model significance or the gyroscope channel’s separate contribution. A fit can remain a numerical failure even when another start looks promising. No result here changes the saved 53-stretch shape comparison.
Every group and direction · All starts · Source selection · Fixed method · Recovery procedure