Local Level Lab

Airborne measurements. Open methods.

Generated nominal 200 Hz solver control

The multimodel 300 Hz control passed its 24 matched fits. This separate software study tests the archive's nominal 200 Hz integration path with all 26 calibration directions.

Generate six 60-second histories: three physical candidates, each with interior or near-boundary Z-gyro calibration. Use a different declared increment-noise seed for each history. Construct increments on an exact 200 Hz grid, with dt = 0.005 s, and fit under the nominal_200Hz clock. The first 39 of 59 receiver reports may determine a fit; the final 20 are withheld until its continuous forecast is saved. Compare both bounded solvers from zero and fixed perturbed starts: 24 task identities.

First qualify source, environment and reboot recovery, then run a separate 10-second, one-task real-worker preflight. Freeze the six recipes, source and native hashes, numerical environment, four one-thread worker allocation, finite per-task native-call and packet-visit limits, and cooperative wall cap. Charge before work and retain failures. Do not read observed aircraft or reserved confirmation data.

Report all 24 numerical stopping outcomes, six four-fit later-path spreads, and withheld error against generated truth. The agreement gate requires all 24 stops and at most 0.1 m spread within each fixture. Report the generated physical screen separately. An exact-grid nominal-clock result tests software wiring and solver stability; it cannot measure sensitivity to irregular packet-header timestamps. Longer generated histories and an explicit timing perturbation control remain necessary before any observed stopping-rule revision. The 50 original nonpassing aircraft fit labels remain unchanged.