Finite forecast-sensitivity check of saved numerical corrections
This is a development diagnostic, not a revised fit or an Earth-model decision. The completed twenty-group study remains unchanged. Select three failed fresh probes by the minimum, median and maximum actual cost change in the saved stopping audit. Their identities are:
| Position | Saved fit identity |
|---|---|
| Minimum | bb8061a43b4f14b6262ceda1-outer-0-header_elapsed-1 |
| Median | a6e658d1550299e4eb9f00a3-outer-0-header_elapsed-1 |
| Maximum | fad74da3a09951b31e882472-outer-0-header_elapsed-0 |
The selection depends on observed numerical stopping behavior, so these three cannot validate an independent failure rate. They cover a useful range for diagnosing whether a small training cost change hides a large later path change.
For each task, take the exact saved training prefix, full IMU increments, original fitted parameters and original forecast from the sealed study. Take the reconstructed bounded correction from the source-bound saved diagnostic. Rebuild the same training problem and calculate one candidate forecast through the same native kernel. Keep every future receiver position absent from the new study inputs. Compare the two predicted paths at the same fixed times, reporting north/east/up RMS and maximum differences over the later interval. Do not score either prediction against withheld positions.
Freeze the input hashes, source/environment hashes, three task identities, three native calls, exact packet-visit allowances, up to three one-thread workers, one-hour cooperative wall limit and separate finite interruption allowance. Qualify task-level reboot recovery before launch. Preserve failures; no alternate start, retry of a sealed failure or allowance expansion is permitted. A completed diagnostic is evidence about numerical forecast sensitivity only. Independent generated known-answer controls and a newly frozen observed study remain necessary before changing any stopping rule.
Interruption recovery
The initial three-task study allows one charged native forecast per case and
one hour of cooperative wall time. Its launcher uses three workers with one
numerical thread each. The existing task-recovery software qualification in
remaining-recovery-request.json and remaining-recovery-tests.xml passed
five source- and environment-bound interruption checks; recheck those exact
bytes before preparing any continuation.
If a reboot interrupts the initial run, first verify that the original
coordinator and all shard leases have exited. Close the original with
lll.studies.task_resume close-original; do not relaunch it. Prepare a
separate continuation with at most two charged attempts per task across
both studies, at most three technical interruptions total, one further
hour of cooperative wall time, and a 5 GiB free-space floor. Its
resume command checks frozen source, inputs, environment, charges and
sealed outcomes and schedules only unfinished tasks. A sealed numerical
failure remains a failure. At most six native forecast attempts can be
charged across the original and continuation together.