Local Level Lab

Airborne measurements. Open methods.

Fresh prediction calibration: why it stopped

The run stopped at a numerical check. It established no uncertainty threshold, and independent validation has not started. The original 53-stretch aircraft comparison is unchanged.

The corrected arithmetic had passed 48 development fits. This larger test used fresh simulated measurements to check whether prediction errors could support a reliable uncertainty threshold. Every physical model fitted its own generated truth: these examples are not votes for globe or flat geometry.

What completed

Item Verified outcome
Software qualification before launch 126 source-bound checks passed.
Returned starts 909 of 7,176 planned, in 9.58 hours.
Numerical outcomes 904 passed; two failed; three stopped cooperatively.
Position-error screens All 906 completed forecasts passed.
Complete noise families with available scores 37 of 299 planned. Related settings and repeated starts are not independent trials.
Calibration threshold Unavailable. The incomplete cohort cannot supply the planned bound.
Independent validation Not launched. Its separate seed cohort remains unused.

All workers exited and released their locks. The remaining allowance is closed; the run will not be extended or restarted.

The specific failure

Both prescribed starts failed for the same noise family: seed 281474977010693, rate-sample input errors, specified-field globe, with upstream field removal allowed. They stopped after 43 and 41 evaluations, below the 200-evaluation limit. Both reported no positive predicted decrease.

Their position predictions were accurate under the fixed screens: later horizontal RMS was about 2.58 m, and height RMS was about 0.31 m. The numerical acceptance check asks a different question: does one fresh bounded correction leave the cost, predicted positions and stationarity stable?

The stationarity and position-change checks passed. The relative cost changed by about 6.27 × 10⁻⁸, exceeding the unchanged 10⁻⁸ limit by about sixfold. Maximum position change was under 0.20 mm. These remain failed fits; small position changes do not override the frozen cost requirement.

Once both starts failed, a required family score was unavailable. The frozen rule therefore stopped the other workers cooperatively. Three interrupted starts remain recorded, alongside every unexecuted planned row.

What follows

The saved fits identify a cost-stability failure; they do not establish its underlying cause or justify relaxing the limit. Any revised numerical method needs separate qualification and a reviewed finite plan before another campaign. No fits or native calculations were run to produce this report.

A publication-path repair passes 106 software checks, including a regression that copies the actual frozen plan through the shared packager. Only the reporter and its test changed after execution; the 242 execution-source snapshots, numerical environment, scientific settings and saved outcomes remain preserved.

This test concerns two-minute generated trajectories and declared error laws. It does not establish actual aircraft error coverage, calibrated significance for the 53 stretches, or readiness to open protected ESA confirmation groups.

Machine-checked report · All planned starts · Frozen plan · Earlier calibration outcome · Next analyses · Reproducibility.