Use the complete screen to choose the next change
The screen is complete: four compatible bounds and two time-limit failures. Publication verifies all six charged attempts and all 36 exact support checks, including failed bounds. Do not retry timeouts or expand this allowance.
The screen measures one sector per candidate/processing group. Even matching reference maps and smaller allowances do not establish the full eight-sector prediction target. Keep the unmodified reference study and every fresh bound visible; take per-axis minima only for compatible maps.
The runtime profiles are complete and identify repeated exact-arithmetic operations as major costs. Follow the compiled arithmetic plan. Qualify the faster implementation against the exact reference; do not relax the mathematical bound or time limit to obtain completion. The long-recording path must become practical before an aircraft prediction study.
Source integration continues with the streamed rows and interval adapter. The source adapter still needs zero-width, clock-boundary and complete native controls, including explicit reference discrepancies and contradictory-interval rejection. It may improve height while widening other allowances, so evaluate the complete compatible calculation before another full comparison.
No new aircraft fits or protected ESA confirmation work follows from this preflight alone.