Score the saved forecasts with the same GPS correction
Apply the GPS history from the force-only check to the six previously verified IMU forecasts on the same two NASA recordings. Verify the receiver coordinates and timestamps against the original forecast inputs before using a correction. IMU21 supplies a zero-correction control. Carry forward the missing zero-field disc forecasts without filling them in.
Keep the saved forecasts and the original local metre conversion fixed. Report horizontal and height RMS at 30, 60 and 120 seconds and over each full forecast, before and after the correction. For each model pair, check the change in the mean squared-error gap against the direct inner product of the shared GPS correction with the forecast separation.
Freeze both source receipts and all six forecasts. Use two tasks on one numerical thread, two charged score calculations per task, and a 90-second cooperative limit. Use no new fit, propagation or recording read. The correction was constructed using the force comparisons on both periods, so this is a sensitivity check of an existing forecast.