Seven repeated full proposals used part of the IMU8 allowance
Seven of the 30 charged training evaluations in the stopped IMU8 zero-field disc fit repeated full proposals already rejected at the same accepted point. The repeats were 10, 12, 14 and 16 from proposal 8, 20 and 22 from proposal 18, and 28 from proposal 26. Their recorded trial costs, predicted decreases and step lengths reproduce exactly. The other six sealed fits have no repeats of this type.
The opt-in solver check reuses only an exact rejected full proposal at the same accepted point. It still runs the local trust-region step and all fresh stopping checks. On the curved control it kept the same endpoint, objective and stopping result with fewer evaluations, using either the tangent or the value-only proposal calculation. Sixteen additional curved, bounded and higher-dimensional controls reached their known objectives and positions. The unfinished control still failed its stopping check. All 68 focused tests passed.
The changed proposal rule has no observed-flight qualification yet. The IMU8 failure remains in the original evidence. The completed IMU21 continuation used its archived original solver. The generated aircraft check reproduced the stopping outcomes, costs and forecasts of all eight saved reference cases with 43 fewer training evaluations.
Verify the saved trace audit from the repository root.
env PYTHONPATH=analysis ~/venv/bin/python -m lll.ilvis0_repeated_trial_audit check