Which archived stretches could enter the matched pilot?
21 of 53 stretches meet the saved file, instrument configuration and receiver checks used in this inventory. They represent 18 conservative flight groups. None is northern. That limits the variety of routes a pilot can test under these checks.
| Instrument | Original stretches | Meet all three checks | Flight groups | Mean latitude range | Course sectors |
|---|---|---|---|---|---|
| IMU8 | 2 | 2 | 2 | 63.1°S to 62.7°S | 1 east, 1 south |
| IMU21 | 51 | 19 | 16 | 62.6°S to 56.7°S | 19 south |
Course sectors are 90° wide, centered on the four cardinal directions. The two available IMU8 stretches share a decoder configuration. The group counts come from the conservative provenance ledger.
The audit joined the source hash and original window times to the flight group and GPS inventories. It checked the configuration on two dates and the individual file's physical conversion. For IMU8 it used the earlier task and filename binding and required full-navigation decoder context. One IMU21 file satisfies both conversion checks but has no strictly decoded receiver stream. All four northern records in the original selection fail at least one of the conversion checks.
The metadata receipt includes every stretch, each check and hashes of the six input ledgers. Recreate it from the repository root with the saved inputs and the audit program:
env PYTHONPATH=analysis ~/venv/bin/python -m lll.ilvis0_matched_pilot_audit
No fit scores, gyro residuals or reserved ESA records were used. The GPS check establishes a single uninterrupted block under the 1.5-second gap rule. It does not establish position accuracy. This inventory leaves the original 53-stretch study intact and selects no pilot recordings. A southern pilot can use the available coverage after the remaining gates pass. A northern comparison requires separate decoder qualification or new input.
The northern clock check found that all four northern files share one configuration. Nominal timing cleared two engineering failures, while the original two-date failure remained. The 21-stretch eligibility result stays unchanged.