Test matched forecasts on the two added NASA flight groups
Use only the two windows selected before fitting in the GPS extension. Require their recorded packet check to pass under both clock conventions. Use the nominal 200 Hz convention for this comparison, as in the initial preflight. Those earlier fits, including any failure, remain separate from this study.
Fit all four shape and field combinations on each window. Use the same calibration limits, receiver weights, normalization, wide tangent arithmetic and stopping rules as the initial preflight. Start each fit once from the original normalized origin. Fit only earlier GPS positions and the associated inertial prefix. Save the later forecast from the full inertial packet stream and query times before reading later receiver positions. Require the original training-prefix agreement check.
Report the fit status and the later RMS errors in horizontal position, height and total position for each of the three receiver solutions. Where both shapes complete at the same retained field, report the two shape rankings separately for that field. Report the globe field ranking only where both complete shape comparisons favor globe in total position on all three receiver tracks. Keep split rankings and missing fits visible. The output describes retrospective predictions. Flight-level uncertainty and a calibrated observed-data decision remain separate work.
Use eight one-start fits, at most 30 training evaluations and one forecast each, up to 248 native calls. Use four one-thread workers with a 60-minute cooperative limit. Keep the exact packet-visit budgets derived from the verified inputs. Qualify task-level recovery before launch. Allow one separately charged technical restart per unfinished task, up to two interruptions and a 90-minute limit on the separate recovery stage. Completed failed fits remain sealed.