Joint-coordinate projection with corrected worker loading
The first execution sealed a zero-start failure: its standalone adapter entry could not resolve a package-relative import. Preserve that original freeze, logs and empty result inventory. The corrected adapter uses an absolute package import, tested through the same standalone loading mechanism as the worker. The mathematical projection and acceptance conditions are unchanged.
This is a separately identified freeze. Use the 48 original saved cases, all 42 coordinates, 84 proposals per case, at most 4,032 proposals and 8,064 exact certificates. Reserve every proposal before execution. Four workers use one thread each, with a 300-second cooperative study allowance and one second per LP. No retries, extension, native integration or original aircraft reads.
Known controls must remain inside the certified intervals. LP infeasibility status alone proves nothing. Keep complete interval/certificate evidence and unchanged scientific abstention. This diagnosis does not establish observation coverage or authorize new aircraft fits.